RESEARCH PROGRAMS

(After Joining MSU in January 1987)

 

RESEARCH PROJECTS

   1.  LIGHTNING PROTECTION RESEARCH PROJECTS
   2.  HIGH VOLTAGE INSULATION RESEARCH PROJECTS
   3.  SELECTED RESEARCH PROJECTS

   

   1.  LIGHTNING PROTECTION RESEARCH PROJECTS: 

 

 


1 m Air Gap

3 m Air Gap

3 m Air gap



 

Go to the top of the page
 
 
3.  SELECTED RESEARCH PROJECTS:


 
 
 
 
 "Investigation on Lightning Performance of Aerostat"  
Principal Investigator: S. Grzybowski  
Sponsor: U.S. Army 
On-going research project, started Fall 2001
 

 
 
 
 
 "Evaluation of The Lightning Withstand of The 69 kV Isolated Phase buses"  
Principal Investigator: S. Grzybowski  
Sponsor: The Calvert Company, Richland, Mississippi  
Completed: December 2002
 

 
 
 
 
 "Evaluation of Station Post Porcelain Insulators"  
Principal Investigator: S. Grzybowski  
Sponsor: Victor Insulators, Inc., Victor, New York 
Completed: June 2002
 

 
 
 
 
 "Evaluation of 69 kV Isolated Phase Bus Cross Section"  
Principal Investigator: S. Grzybowski  
Sponsor: The Calvert Company, Richland, Mississippi 
Completed: December 2001
 

 
 
 
 
 "60 Hz Flashover Voltage, Lightning Impulse Critical Flashover Voltage of Composite Insulators"  
Principal Investigator: S. Grzybowski  
Sponsor: MacLean Power Systems, Franklin Park, Illinois
Completed: May 2001
 

 
 
 
 
 "Fiberglass Distribution Pole, Added CFO Voltage by Fiberglass Pole"  
Principal Investigator: S. Grzybowski  
Sponsor: Alabama Power Company, Birmingham, Alabama
Completed: December 2000
 

 
 
 
 
 "Fiberglass Distribution Pole, Electrical Degradation (Accelerated Aging) of Fiberglass Distribution Pole"  
Principal Investigator: S. Grzybowski  
Sponsor: Alabama Power Company, Birmingham, Alabama
Completed: December 2000
 

 
 
 
 
 "Multistress Lifetime Characteristic of Encapsulated Fine Gauge Magnet Wire"  
Principal Investigator: S. Grzybowski  
Sponsor: Thomson Consumer Electronics, Indianapolis, Indiana
Completed: December 2000
 

 
 
 
 
 "Dry and Wet 60 Hz Withstand Voltage Test on Double-Bushing Potential Transformers"  
Principal Investigator: S. Grzybowski  
Sponsor: Kuhlman Electric Corporation, Crystal Springs, Mississippi 
Completed: November 2000
 

 
 
 
 
 "Performance Evaluation of 36 kV Station Class Surge Arrestors under 60 Hz Voltage"  
Principal Investigator: S. Grzybowski  
Sponsor: TVA, Chattanooga, Tennessee
Completed: August 2000
 

 
 
 
 
 "Lightning Impulse Withstand Voltage and 60 Hz Wet Withstand Voltage Test on Three-Phase Vacuum Switch"  
Principal Investigator: S. Grzybowski  
Sponsor: Bridges Electric, Inc., Heber Springs, Arkansas
Completed: August 2000
 

 
 
 
 
 "60 Hz Flashover and Withstand Voltages, CFO Voltage of 138 kV Fiber Optic Insulator"  
Principal Investigator: S. Grzybowski  
Sponsor: Reliant Energy HL&P, Houston, Texas
Completed: June 2000
 

 
 
 
 
 "60 Hz Flashover Voltage and CFO Voltages of 69 kV Polymer Insulators Removed from Service"  
Principal Investigator: S. Grzybowski  
Sponsor: Arizona Public Service Co, Phoenix, Arizona
Completed: April 2000
 

 
 
 
 
 "RIV and 60 Hz Flashover Voltage Tests on Composite Line Post Insulators"  
Principal Investigator: S. Grzybowski  
Sponsor: MacLean Power Systems, Franklin Park, Illinois
Completed: April 2000
 

 
 
 
 
 "60 Hz Flashover and Lightning Impulse Withstand Voltages of Two Porcelain Bushing Assemblies"  
Principal Investigator: S. Grzybowski  
Sponsor: General Electric Company, West Burlington, Iowa
Completed: February 2000
 

 
 
 
 
 "Magnet Wire Accelerated Aging"  
Principal Investigator: S. Grzybowski  
Sponsor: Thomson Consumer Electronics, Indianapolis, Indiana
Completed: December 1999
 

 
 
 
 
 "Lightning Impulse Voltage Testing of DDG51 FLT IIA Model Structure"  
Principal Investigator: S. Grzybowski  
Sponsor: U.S. Office of Naval Research
Completed: September 1999
 

 
 
 
 
 "Evaluation of Emission Current from IPG-144, IPG-100, IPG-32 at Switching Impulse"  
Principal Investigator: S. Grzybowski  
Sponsor: Lightning Eliminators & Consultants, Boulder, Colorado 
Completed: November 1998
 

 
 
 
 
 
"Switching Surge Impulse Sparkover Voltage-Time Characteristics of 420 kV and 192 kV Lightning Arresters Removed from Service by TVA"  
Principal Investigator: S. Grzybowski  
Sponsor: Teneessee Valley Authority (TVA), Huntsville, Alabama 
Completed: October 1998
 

 
 
 
 
"Evaluation of Transmission Lightning Arresters Removed from Service by TVA"  
Principal Investigator: S. Grzybowski  
Sponsor: Teneessee Valley Authority (TVA), Huntsville, Alabama 
Completed: August 1998
 

 
 
 
 
"Study of Laser Triggered System for Electrical Discharges over a Long Path-Part I"  
Principal Investigator: S. Grzybowski  
Sponsor: Electric Power Research Institute (EPRI), Palo Alto, California 
Completed: June 1998
 

 
 
 
 
"Verification of the Least Time/Maximum Probability Theory of Lightning Propagation"  
Principal Investigator: S. Grzybowski  
Sponsor: LT-MP Applications, Cypress, California 
Completed: May 1998
 

 
 
 
 
"Study on Dielectric Breakdown in Thomson Consumer Electronics HV Component"  
Principal Investigator: S. Grzybowski  
Sponsor: Thomson Consumer Electronics, Indianapolis, Indiana  
Completed: April 1998
 

 
 
 
 
"Qualification Test on Post Insulator"  
Principal Investigator: S. Grzybowski  
Sponsor: W. H. Salisbury & Co., Skokie, IL 
Completed: August 1997
 
 
 
 
 
 
"Investigation of Early Streamer Emission Air Terminals 
Principal Investigator: S. Grzybowski  
Sponsor: Lightning Protection International PTY LTD, Australia 
Completed: June 1997
 
 
 
 
 
 
"Evaluation of Lightning CFO Voltage of 69 kV and 138 kV Transmission Structures
Principal Investigator: S. Grzybowski 
Sponsor: Wisconsin Power and Light, Madison, WI 
Completed: April 1997 
 
 
 
 
 
 
"Temporaary Overvoltage Tests on 6.0 kV Rated Lightning Arresters
Principal Investgator: S. Grzybowski  
Sponsor: Raychem Corporation, Menlo Park, CA 
Completed: April 1997 
 
 
 
 
 
 
"Electrical Breakdown Strength of XLPE Cables Under Combined ac-dc Voltage
Principal Investgator: S. Grzybowski  
Sponsor: Mississippi State University 
Completed: April 1997 
 
 
 
 
 
"Study on Influence of Spline Ball Ionizers on Lightning Protection of Transmission and Distribution Lines - Using Long Air Gap Model
Principle Investigator: S. Grzybowski  
Completed: October 1996 
 
 
 
 
 
 
"Electrical Performance of 115 kV Fiberglass Crossarm Removed from Service by TVA
Principal Investigator: S. Grzybowski 
Sponsor: Tennessee Valley Authority, Chattanooga, TN 
Completed: February 1996 
 
 
 
 
 
 
"Lightning Performance of 115 kV Transmission Line with Wood Crossarm
Investigator: S. Grzybowski  
Sponsor: ENTERGY SERVICES, INC., New Orleans, LA 
Completed: August 1995 
 
 
 
 
 
 
"Temporary Overvoltage Tests on Two Types of 9.0 kV Rated Lightning Arresters
Principal Investigator: S. Grzybowski  
Sponsor: Raychem, Menlo Park, CA 
Completed: April 1995 
 
 
 
 
 
 
"Evaluation of 38 Year Old Porcelain Suspension Insulators Removed from a 230 kV Transmission Line
Principal Investigator: S. Grzybowski  
Sponsor: ENTERGY SERVICES, INC., New Orleans, LA 
Completed: October 1994 
 
 
 
 
 
"A Study of Bow-Tie Trees in 115 kV XLPE Cable
Principal Investigator: S. Grzybowski  
Sponsor: Chevron, Pascagoula, MS 
Completed: July 1994 
 
 
 
 
 
"RIV and Corona Evaluation on Braced and Unbraced 230 kV Polymer Line Post Insulators
Principal Investigator: S. Grzybowski  
Sponsor: Florida Power & Light Company, Juno Beach, FL 
Completed: June 1994 
 
 
 

 
 

"Reducing Substation Phase-to-Phase and Phase-to-Ground Air Clearances
Principal Investigator: S. Grzybowski  
Sponsor: ENTERGY SERVICES, INC., New Orleans, LA 
Completed: March 1994 
 

 
 
 
 
"Influence of Spline Ball Ionizers on Lightning Protection of 115 kV Transmission Lines
Principal Investigator: S. Grzybowski  
Sponsor: ENTERGY SERVICES, INC., New Orleans, LA 
Completed: December 1993  
 

 
 
 

"Investigation of the Lightning Impulse Performance of 115 kV and 230 kV Substation
Principal Investigator: S. Grzybowski  
Sponsor: ENTERGY SERVICES, INC., New Orleans, LA 
Completed: January 1993 
 
 
 
 
 
 
"Lightning Protection Design Software
Co-Investigators: D.B. Miller, S. Grzybowski, J.W. Herring 
Sponsor: EPRI RP2542-8, subcontract with Power Technologies, Inc. 
Completed: November 1992 
 
 
 
 
 
 
"Effectiveness of Dissipators Used for Lightning Protection on 115 kV Transmission and 13 kV Distribution Lines
Investigator: S. Grzybowski 
Sponsor: Mississippi Power & Light Company, Jackson, MS 
Completed: January 1992 
 
 
 
 
 
"Lightning Performance of 161 kV and 500 kV Lightning Arresters
Investigator: S. Grzybowski  
Sponsor: Tennessee Valley Authority, Chattanooga, TN 
Completed: December 1990 
 
 
 
 
 
 
"Electrical Performance Under Steep-Front Impulses of the Porcelain Suspension Insulators Used on FP&L Transmission Lines
Investigator: S. Grzybowski  
Sponsor: Florida Power & Light Company, FL 
Completed: August 1990 
 
 
 
 
 
 
 "Electrical Performance of Transmission Line Fiberglass Cross-arm Used by MP&L
Investigator: S. Grzybowski  
Sponsor: Mississippi Power & Light Company, Jackson, MS 
Completed: June 1990   
 
  
  
  
  
 
"DC Dissipation Current from Elements Used for Lightning Protection
Investigator: S. Grzybowski  
Sponsor: Mississippi Power & Light Company, Jackson, MS 
Completed: June 1990 
 
 
 
 
 
 
"Critical Flashover Voltage of Wood Crossarms
Investigator: S. Grzybowski  
Sponsor: Hughes Brothers, Nebraska 
Completed: April 1990 
 
 
 
 
 
 
"A Guide to Estimating Lightning Insulation Levels of Overhead Distribution Lines
Co-investigator: P.B. Jacob, S. Grzybowski, L. Libby 
Sponsor: Electric Power Research Institute(EPRI), PR 2874-01, Palo Alto, CA 
Completed: May 1989   
 
  
  
  
  
 
"Determination of Design BIL Levels for Specified Distribution Line Insulation Systems
Co-investigator: P.B. Jacob, S. Grzybowski, L. Libby 
Sponsor: Louisiana Power and Light Company, New Orleans, LA 
Completed: March 1988 
 
 
Go to the top of the page
 
Go back to Go back to My Home Page